We equipped the production of steel structures with a line of preparation and coloring of products in the 2nd stage:

Stage 1 included a shot blasting chamber, a painting and drying chamber, an overhead cross conveyor, and a paint preparation room.
The 2nd stage included a painting and drying chamber, additional elements of the overhead cross conveyor to increase the productivity of the product preparation and painting line.